![]() ![]() Locations, dimensions, grades and flow direction of existing sewers, culverts, and water lines, as well as other underground and aboveground utilities within and adjacent to the property including profiles, grading, cross section and other construction details of proposed facilities. Buildings, structures, additions, signs (with design details for proposed signs) and required setbacks. Watercourses, lakes and wetlands (with names). A permit under this chapter for a use requiring a variance shall be issued by the Zoning Officer only upon the written order of the Zoning Hearing Board following review by the Township Planning Commission and a public hearing conducted by the Zoning Hearing Board. A permit under this chapter for a use requiring a special exception shall be issued by the Zoning Officer only upon the written order of the Zoning Hearing Board following review by the Township Planning Commission and a public hearing conducted by the Zoning Hearing Board. ![]() ![]() A permit under this chapter for a conditional use shall be issued by the Zoning Officer only upon the written order of the Board of Supervisors following review by the Township Planning Commission and a public hearing conducted by the Board of Supervisors. ![]() Certain principal permitted uses as designated on the Schedule of Uses in § 400-14A require site plan approval in accord with § 400-121C(9). (2) Principal permitted use site plan review. If a use is listed as a principal permitted use or an accessory use by this chapter and meets the requirements of this chapter, the Zoning Officer shall issue a permit in response to a complete application. (1) Principal permitted uses (permitted-by-right uses) and accessory uses. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |